Skytrak 6042 Service Manual User Manual Page 318

  • Download
  • Add to my manuals
  • Print
  • Page
    / 544
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 317
Hydraulic System
8.86
Model 6042 Legacy Origin 7/02
b. Secondary Function Manifold Disassembly,
Cleaning, Inspection and Assembly
1. Secure the secondary function manifold (Fig. 8-50, 1)
in a suitable bench vise if possible.
Figure 8-50 The Secondary Function
Manifold Components
2. Remove the 2,500 psi (172 bar) pressure-reducing
valve (Fig. 8-50, 2).
3. Remove the 550 psi (38 bar) pressure-reducing
valve (Fig. 8-50, 3).
4. Remove the 650 psi (45 bar) pressure-relief valve
(Fig. 8-50, 4).
5. Remove the solenoid nuts (Fig. 8-50, 5), coils (6)
and cartridges (7).
6. Remove the check valve (Fig. 8-50, 8).
7. Clean all components with a suitable cleaner before
inspection.
8. Inspect the solenoid cartridges for proper operation.
Check by shifting the spool to ensure that it is
functioning properly. Check that the spring is intact.
Inspect the cartridge interior for contamination.
9. Inspect internal passageways of the secondary
function manifold and its component parts for wear,
damage, etc. If inner surfaces of the secondary
function manifold DO NOT display an ultra-smooth,
polished finish, or components are damaged in any
way, replace the secondary function manifold or
appropriate part. Often, dirty hydraulic fluid causes
failure of internal seals and damage to the polished
surfaces within the secondary function manifold.
Note: ALWAYS replace seals, o-rings, gaskets, etc.,
with new parts to help ensure proper sealing and operation.
Lubricate seals and o-rings with clean hydraulic oil.
10. Secure the secondary function manifold (Fig. 8-50, 1)
in a bench vise or by other suitable means.
11. Install the pressure-reducing valve assembly
(Fig. 8-50, 2) and torque to 60-70 lb-ft (81-95 Nm).
12. Install the pressure-reducing valve assembly
(Fig. 8-50, 3) and torque to 35-40 lb-ft (47-54 Nm).
13. Install the relief valve assembly (Fig. 8-50, 4) and
torque to 25-30 lb-ft (34-41 Nm).
14. Install the check valve (Fig. 8-50, 8).
15. Install the solenoid cartridges (Fig. 8-50, 7) and torque
to 25-30 lb-ft (34-41 Nm). Install the solenoid
coils (6) and nuts (5). Torque the nuts to 4-6 lb-ft
(5-8 Nm).
MT2900
5
6
7
5
6
7
4
3
2
1
8
Torque to
25-30 lb-ft
(34-41 Nm)
Torque to
35-40 lb-ft
(47-54 Nm)
Torque to
60-70 lb-ft
(81-95 Nm)
Torque to
25-30 lb-ft
(34-41 Nm)
Torque to
25-30 lb-ft
(34-41 Nm)
Torque to
4-6 lb-ft
(5-8 Nm)
Page view 317
1 2 ... 313 314 315 316 317 318 319 320 321 322 323 ... 543 544

Comments to this Manuals

No comments